What’s New in Oracle Primavera P6 24.12?
Oracle released Primavera P6 24.12. There are many new features related to Primavera P6 Professional and EPP M comparing to 23.12 version.
These new features are:
Bug Fixes:
- The Primavera P6 24.12 release includes nine bug fixes from Oracle, showcasing their commitment to resolving identified issues within the software.
Improved Filtering in the Card View of Status Updates:
- Flexible filtering options based on dates, contributors, activity IDs, WBS codes, status, type, and review type.
- Quick and efficient location of specific status updates.
Define a Default Database for a Database Instance:
- Option to designate a default database instance for new installations or when the previous database selection is not retrievable.
- Enhances user experience with a seamless and predictable database selection process.
Modifying Security Privileges:
- Consolidated view of all privileges in a single, searchable list.
- Assign” option allows for quick modification of privileges within categories.
Easy Access to Audit Data:
- EPS page displays comprehensive audit data.
- Customizable audit period and table selection.
- Improved visibility and accessibility of historical changes.
Migration from OBIEE to Oracle Analytics Server:
- Transition to OAS for enhanced analytics and data visualization.
- Ensures existing functionalities are preserved and recommends precautionary backups.
Open P6 Directly From an Activity Email:
- Generated emails include hyperlinks that direct recipients to the specified project and activity in Primavera P6.
Faster Startup Time for P6 for Android and iOS:
- Option to skip initial data download at login to reduce login time.
- Manual data synchronization available if offline access is needed.
Milestone Activities Support All Relationship Types:
- Supports all relationship types for start and finish milestones.
- Streamlined conversion of activities to milestones.
- Preserves relationship types when importing schedules from various sources.
Improved Clarity About Database Login:
- Database and Language options are now prominently displayed on the login page, eliminating the need to expand the “Advanced” section.
Summary Bar Labels:
- Displays aggregated values for selected fields at the grouping level.
- Provides concise visual representation of key metrics within grouped sections of the project schedule.
User Administration Improvements:
- Centralized view of the total user count.
- Roll-up of user distribution across different modules.
- Enhanced filtering to hide inactive users.
- Improved clarity and efficiency in user administration.
Exclude Secure Codes When Pasting Data:
- Option to exclude secure code assignments during data transfer operations.
- Enhances usability and adaptability of Primavera P6.
Export Hierarchical Code Value Path to CPP:
- Export includes the complete hierarchical path and code value path of each activity.
- Enhances data clarity and integrity in the CPP format.
Drag Milestones and Remaining Early Start Date:
- Manually adjust schedule by dragging milestones on the Gantt Chart.
- Apply “Start On or After” constraints.
- Flexibility in adjusting schedules for in-progress activities.
Standardize User Settings:
- “Copy User Settings” dialog box for replicating configurations across multiple users.
- Controls access to modules, resources, and projects.
- Ensures consistent and controlled user access and preferences.
Web Service Allow List for REST Services (Cloud Only):
- Extended to include Web Service REST endpoints.
- Enhances security and control over web services access.
Sample User Inactivity Report Improved:
- Includes the creation date of user accounts.
- Differentiates between inactive users and new accounts.